
Revalidation for REFGPMD Flow Lines
Client : SAUDI ARAMCO Location : Udhailiyah Duration : Sep-2015 to Oct-2018 Status […]

Tasnee Housing Maintenance Services
Client : TASNEE Location : Jubail Duration : 2008 to 2019 Status : Ongoing […]

Shipping & Logistics Support Services
Client : SHARQ Location : Jubail Duration : 2000 to 2019 Status : Ongoing […]

General Construction Services in all SABIC Affiliates.
Client : SABIC Location : Jubail/Yanbu Duration : Jul-2014 to Jul-2019 Status : Ongoing […]

Plant Lighting Maintenance Services
Client : SAUDI KAYAN Location : Jubail Duration : Feb-2016 to Feb-2017 Status […]

In Plant Work Support Services
Client : SADARA Location : Jubail Duration : May-2014 to May-2017 Status : Ongoing […]

In-Plant Hot Works Support
Client : GAS Location : Jubail Duration : May-2016 to May-2017 Status : Ongoing […]

Tank Cleaning and Sludge Treatment.
Client : KJO / Al-Jalhami Location : Khafji Duration : Jan-2004 to Jul-2017 […]

Flare line Services for Unconventional Resources Department
Client : SAUDI ARAMCO Location : Jubail Duration : Feb-2016 to Feb-2018 Status […]
- Replce FCV Piping at Abu Ali (Nov-2014 to Dec-2014)
- Demolish / Relocate Loads of MCC-01, 9 &10 at Air & Water Plant Abqaiq (May 2013 to Dec-2013)
- Mechanical & Civil Works at RT Refinery. (Oct-2006 to Sept-2013)
- Paving Works at Safaniyah Facilites (Apr-2011 to Sep-2012)
- Replace Control systems, Crude Oil Stabilizer & Sulfur Recovery for NAPD (Jan-2011 to Jul-2012)
- Construction, Maintenance & Repair Services for NAPD (Jul-2005 to Jun-2012)
- Mechanical Pipeline Project & Plant Maintenance Works at Riyadh Refinery (Feb-2008 to Feb-2012)
- T&I Cls # 14 & 15 Suct Line Excavation, Dewatering and Backfilling (Nov-2011)
- Slope Protection works at Khursaniya Gas Plant (Apr-2011 to Oct-2011)
- Sulfur Loading Pump Replacement at Riyadh Refinery (Apr-2011 to May-2011)
- Install Over Head Crane For CSF Exchanger at Riyadh Refinery (Nov-2010 toApr-2011)
- Install Perimeter Fence Around Safaniyah Landfill (Jul-2010 to Mar-2011)
- Repair Sulfur-di-oxide Solution FRP Tanks. (Oct-2010 to Mar-2011)
- Chlorination System Upgrade at Riyadh Refinery (Jul- 2010 to Jan-2011)
- Replace Existing Turbines with Motors at Riyadh Refinery (July-2010 to Jan-2011)
- Install connector Bridges Hawiyah NGL Facility (Aug-2009 to Jan-2011)
- Removing / Re-Install The Retrofit Packing (Jan-2009 to Dec-2010)
- Replace Pumps at Ras Tanura Refinery (Oct-2010 -Dec-2010)
- Upgrade 05 Swales Bridges at Hawiyah NGL Plant (Apr-2010 to Dec-2010)
- Build New Materials Yard at Ras Tanura (Aug-2010 to Nov-2010)
- Remove/Re Install Trays On Crude Stabilizer at Udhailiyah (Jun-2010 to Aug-2010)
- Pre-Commissioning Support at SRU Unit (Jun-2010 to Jul-2010)
- Post Inspection Repairs To T/W Tank 39-T-002 (Jun-2010 to Jun-2010)
- Installation Of Phone And It Infrastructure at Abu Ali Plants (Apr-2010 to Jun-2010)
- Civil & Mechanical Repair – Road Crossing #4 T&I at RT Refinery (Feb-2010 to May-2010)
- Repair Dearator & Filters Qswp (Jan-2010 to May-2010)
- Khurais Gas Train 2 T&I – Colescar Pack and Tray works (Apr-2010 to May-2010)
- Repair Flare Tips Of D-80 at HdGP (May 2010 to May 2010)
- Steam condensate upgrade at Riyadh Refinery (Aug-2009 to Mar-2010)
- Install Tunable Diode Laser Analyzer (Jan-2010 to Mar-2010)
- Building Routine Maintenance (2008-2009)
- 20/22 Harmaliyah Transfer Line Decuruding (Nov-2009)
- New Deluge System For Sheadgum Gas Plant Spheres (Jun-2009 -Nov-2009)
- Install Online Corrosion Inhibitor Monitor System (May-2009 to Nov-2009)
- Replace Asphalt Tanks Sample Collection Pit (Jun-2009 to Jul-2009)
- Replace Water Pump at Abqaiq (Dec-2008 to May-2009)
- Automation Of Gas Monitoring System (Nov-2008 to Apr-2009)
- Steam Condensate Upgrade at Riyadh Refinery (Jan.2009 to Apr-2009)
- Install Photocells At NSP Area (Nov-2008 to Mar-2009)
- Housekeeping For CSF (2008)
- Upgrade Sump Level Control Sys. (Jun-2008 to Sep-2008)
- Pipe Anchor for Salt Water Disposal Pump at Udhailiyah (May 2008 to Aug-2008)
- BGP – Plant 471 T& I Shutdown Support Services (Jun-2008 to Jul-2008)
- Relocate and Upgrade Metal Shop at Udhailiyah (Mar-2008 to Jun-2008)
- Installation of Water Spray Rings (Sep-2007 to Jan-2008)
- Install Of LEL Monitoring System at Abqaiq Plant-462 (Dec-2007 to Jan-2008)
- Installation of Discharge Shipper Line at Udhailiyah (Apr-2007 to Aug-2007)
- Electrical works & instrumentation works (Nov-2006 to Apr-2007)
- T& I / Shutdown Support Services at Udhailiyah (Nov-2006 to Mar-2007)
- Replace Oily Water Sump Pumps at Ras Tanura Refinery (Sep-2006 to Jan-2007)
- Installation of lube oil skids with auto controls (Apr-2006 to Aug-2006)
- Replacement of flow meters at Najmah (Jan-2005 to Jul-2005)
- HADEED – Install Liqui Rob System for CCM-4 (Sep-2015 to Oct-2015)
- PETROKEMYA – Install De-Superheater on EPC basis (Mar-2015 to Oct-2015)
HADEED – Replace & Upgrade Power Stack Fan for DR Module A/B (Nov-2014 to Apr-2015) - IBN-BAYTAR – Replacement of Crusher with higher capacity (Feb-2014 to Mar-2014)
- SHARQ – Tie-In of Isolation Valve for LP De-Ethanizer Reboiler Column at SHARQ (Feb-2014 to Mar-2014)
- SHARQ – Housing Maintenance (1997 to 2013)
- SHARQ – Building Maintenance Service (2007 to 2012)
- IBN-ZAHR – REPAIR Deck Slab & Walls/Base Slabs of CULVERT C2, C8, C9 & C6 / Replace cable channel covers (Sept-2011 to Mar-2012)
- AR-RAZI – New Maintenance Yard Asphalt Jobs (40817)
- GAS – Gas Cooler Drill 3″ & Nozzle Welding (Shutdown) at SHARQ (40695)
- HADEED – Change FMT Frame at Hadeed (Nov-2011 to Oct-2010)
- GAS – Cathodic Protection Installation Phase 4 Sea Water Return Pit (May-2010 to Aug-2010)
- GAS – Replace SW I/O Plate Heat Exchanger (Nov-2009 to Dec-2009)
- IBN-ZAHR – Reactor Headers Repair at IBN-ZAHR (Mar-2007 to Dec-2009)
- GAS – Charge Heater Instrument Modification (39814)
- IBN-ZAHR – Reactor Headers Repair (Mar-2009 to Dec-2007)
- IBN-ZAHR – Replace 03 Ea. Expansion Bellows 60” Dia (39387)
- SAFCO – Tank Base Plate Modification works (Mar-2007 to May-2007)
- SAFCO – Dedusting System Modification (Mar-2007 to May-2007)
- IBN-ZAHR – Site Preparation works for U&O Package (Feb-2007 to Apr-2007)
- TASNEE – Building Maintenance Services (2008 to 2013)
- ADVANCED – Housing Maintenance Services (2009 to 2013)
- TASNEE – Purging Speed-up and LEL Free at PDH Plant, TASNEE (Nov-2010 to Feb-2011)
- S-CHEM – O&M Support Service (2010)
- TASNEE – Installation of Duplex Filters (May-2010 to Jul-2010)
- JANA (NAMA) – LSTK – Civil, Mechanical, Electrical & Instrumentation Work For Sodium Chlorite Incinerator Project (Apr-2009 to Feb-2010)
- TASNEE – Installation of Ammonia Dozing Pumps (Jan-2009 to Dec-2009)
- TASNEE – Replace Sluice Gate at SW Return (Sept-2009 to Nov-2009)
- TASNEE – Extension Of Container Yard And Associated Works (Mar-2009 to Apr-2009.)
- TASNEE – Install By-Pass C2 Type Strainer at the De-Ethanizer (39814)
- JANA (NAMA) – General Maintenance Service (2008)
- JANA (NAMA) – Piping Works & Support Installation For Foam & Fire Water Sprinkler Systems – (Apr-2008 to Jun-2008)
- SATORP – Tie-In from Light Naphtha to product Tank on EPC basis (Jul-2015 to Nov-2015)
- SATORP – SATORP – Naphta & Diesel Line Jumpover Demolition (May-2014 to Jun-2014)
- SATORP – 6” & 8” Propylene Line from JERP to APPC & TASNEE (Jul-2013 to Dec-2013)
- SATORP – JERP Package # 08 Piping Project – Piping & Structural Works (May-2013 to Jun-2013)
- SATORP – Benzene Line to Saudi Chevron Plant (May-2013 to Jun-2013)
- SATORP – JERP/SATORP Package-8 36” Crude Oil Line (Feb-2013 to Mar-2013)
- DOW / FLUOR – Construction of RO Water Project for SADARA (Dec-2014 to Oct-2015)
- L&T – PE LSPB-1 – Piping Works for SADARA (Feb-2014 to Aug-2014)
- FUTAI – Sanitary Waste Water Conveyance Facilities at Ras Tanura for SAUDI ARAMCO (Jun-2013 to Jun-2014)
- GCC – JERP Package # 08 Piping Project – Pipeline Works for SATORP (Oct-2010 to Jul-2012)
- ARCC – Upgrade Southern Area Flare at Abqaiq Area for SAUDI ARAMCO (Apr-2009 to Feb-2010)
- DAYIM PUNJ LLOYD – Structural And Deluge System For Tanks at Saudi Kayan for SAUDI KAYAN (Jun-2009 to Jan-2010)
- SNAMPROGETTI – Construction To The Qatif North Gosp-1 Project, Saudi Aramco for SAUDI ARAMCO (May-2004 to Jun-2006)